Eco Power Energy Ltd Logo

Renewable energy that doesn't cost the earth.

Available Government Grants for Electric Cars

The team at Eco Power Energy Ltd are working with the government to help increase the number of electric cars and cut emissions. 

As well as installing the latest charge point solutions across the UK, we are committed to helping you reduce costs. We’ll help you apply for any available grant, find up to date information here

Government Grants

We are helping the government with their push towards cutting emissions, with the Electric Vehicle Homecharge Scheme (EVHS) offering a maximum of £350 or 75% towards the government schemes.

Eligibility

We are accredited by the Office of Low Emissions Vehicles which helps with the installation of grant-funded car chargers. The criteria for the grant includes:

Eligibility

  • Keeping an Electric Vehicle (New, Pre-Owned, or Leased)

  • Became the Registered Keeper on or after October 2016

  • Can Provide Evidence of Keepership

  • Have Permission from the Property Owners (If Applicable)

  • Have a Suitable Domestic Property for Installation

  • Have Suitable Off-Road Parking

  • You must install an OLEV-approved chargepoint

  • You must use an OLEV-approved chargepoint installer

Don’t worry, our services are still available to those who don’t qualify, however some installation costs will apply.

Requirements for Charge Point Installation

Before a domestic charge point can be installed, the standard requirements for installation need to be met. These include:

Requirements for Charge Point Installation

  • A maximum run of 10 metres from the source of supply (consumer unit) to charge point

  • The property’s consumer unit must be RCD-protected and have a spare way for protecting the outgoing charge point circuit

  • Cable to be surface mounted and clipped direct

  • No groundwork

  • The property must have an earthing arrangement complying with current regulations i.e. gas and water services must be earthed

  • The charge point must be fixed to the main property and able to utilise the property’s earthing arrangement

  • The homeowner must comply with all current OZEV Domestic Scheme Terms and Conditions

We will carry out a pre-installation survey which can be completed remotely or with a physical visit where required. We always make any installation work required outside of this criteria completely transparent, quoting any potential additional charges. Any non-typical installations will also naturally incur charges relevant to the job, these include things such as long cable runs and improvement to earthing

Is your vehicle eligible for the OZEV grant? Click on the button below to take the next step.

List of eligible vehicles

CONTACT US FOR FURTHER INFORMATION ON THE AVAILABLE GOVERNMENT GRANTS AND FOR THE WORK WE PROVIDE FOR OWNERS OF ELECTRIC CARS ACROSS THE UK.