Eco Power Energy Ltd Logo

Renewable energy that doesn't cost the earth.

Available Government Grants for Electric Cars

The team at Eco Power Energy Ltd are working with the government to help increase the number of electric cars and cut emissions. 

We help install chargers and systems across the UK, as well as help people apply for government grants for installations and vehicles to help build towards a sustainable future.

Government Grants

We are helping the government with their push towards cutting emissions, with the EV Grant Scheme offering a maximum of £500 or 75% towards the government schemes.

Eligibility

We are accredited by the Office of Low Emissions Vehicles which helps with the installation of grant-funded car chargers. The criteria for the grant includes:

Eligibility

  • Keeping an Electric Vehicle (New, Pre-Owned, or Leased)

  • Became the Registered Keeper on or after October 2016

  • Can Provide Evidence of Keepership

  • Have Permission from the Property Owners (If Applicable)

  • Have a Suitable Domestic Property for Installation

  • Have Suitable Off-Road Parking

Our services are still available to those who don’t qualify, but installation costs will apply.

Requirements for Charge Point Installation

Before a domestic charge point can be installed, the standard requirements for installation need to be met. These include:

Requirements for Charge Point Installation

  • A maximum run of 10 metres from the source of supply (consumer unit) to charge point

  • The property’s consumer unit must be RCD-protected and have a spare way for protecting the outgoing charge point circuit

  • Cable to be surface mounted and clipped direct

  • No groundwork

  • The property must have an earthing arrangement complying with current regulations i.e. gas and water services must be earthed

  • The charge point must be fixed to the main property and able to utilise the property’s earthing arrangement

  • The homeowner must comply with all current OLEV Domestic Scheme Terms and Conditions

We will carry out a pre-installation site survey, with any installation work required outside these criteria quoted and incurring additional charges. Non-typical installations will also incur charges, these include long cable runs and improvement to earthing. 

Is your vehicle eligible for the OLEV grant? Click on the button below to take the next step.

OUR LIST OF ELIGIBLE VEHICLES

CONTACT US FOR FURTHER INFORMATION ON THE AVAILABLE GOVERNMENT GRANTS AND FOR THE WORK WE PROVIDE FOR OWNERS OF ELECTRIC CARS ACROSS THE UK.